Insights from an intervention of a performance measurement system covering all change steps: the paradox of informed change leadership passivity

Andreas Norrman, Dag Näslund

Research output: Contribution to journalArticlepeer-review

Original languageEnglish
JournalProduction Planning and Control
DOIs
StatePublished - Jan 27 2025
Externally publishedYes

ASJC Scopus Subject Areas

  • Computer Science Applications
  • Strategy and Management
  • Management Science and Operations Research
  • Industrial and Manufacturing Engineering

Keywords

  • Change management
  • institutionalize
  • intervention-based research
  • paradox
  • performance measurement

Cite this