Skip to main navigation Skip to search Skip to main content

Waste Water Force Main Pipe Construction Alternatives to Protect Existing Foundations in the City of Chandler: Case Study

  • Jonghoon Kim
  • , Andrew Baird
  • , Dan D. Koo
  • , Samuel T. Ariaratnam
  • , Wai K.O. Chong
  • Oklahoma State University
  • AZTEC Engineering
  • IUPUI
  • Arizona State University

Research output: Contribution to journal › Conference article › peer-review

Original languageEnglish
Pages (from-to)1004-1012
Number of pages9
JournalProcedia Engineering
Volume145
DOIs
StatePublished - 2016
Externally publishedYes
EventInternational Conference on Sustainable Design, Engineering and Construction, ICSDEC 2016 - Tempe, United States
Duration: May 18 2016 → May 20 2016

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 6 - Clean Water and Sanitation
    SDG 6 Clean Water and Sanitation

ASJC Scopus Subject Areas

  • General Engineering

Keywords

  • Forcemain Pipe
  • Foundation
  • Noise Wall
  • Shoring
  • Slope Stablity

Fingerprint

Dive into the research topics of 'Waste Water Force Main Pipe Construction Alternatives to Protect Existing Foundations in the City of Chandler: Case Study'. Together they form a unique fingerprint.

Cite this